Sealing Integrity Clamp for 10” x 6” Tie-in

Product/service
Emergency Repair
Location
Northern Norway, Processing Plant
Year
2019
Project manager
Roald Kolsnes
Project type
Emergency repair

Project description

During maintenance, the operator discovered a leak in a 10x 6″ piping system. The leak was in an existing golden weld with nearby pipes and obstructions. IK Topside delivered and installed an integrity clamp. The fast-track project was delivered based on the IK CBER system and our speciality understanding of repair systems. 

 

  • Emergency response CBER 
  • Tie in split clamp 
  • Integrity clamp