IK Topside Deliver and Design 37 Clamps

Product/service
Emergency Repair
Year
2022
Location
Europe
Project manager
Roald Kolsnes

Project description

IK Topside was approached after a client found a corroded flange on two large tanks at a refinery plant in Norway. Our team of engineering experts designed two different types of clamps and delivered 37 repair clamps, which were successfully delivered and installed in Q3/Q4 2022, saving the client time and money. 

“This was an exciting project for us because of the high volume of identical clamps and because we needed to prepare an efficient installation plan for the site operation to avoid many crane operations.” 

– Roald Kolsnes
Pipeline Intervention Manager