IK Topside team have once again shown why they are a leader in the emergency pipe repair field.
At the start of April, IK Topside received an urgent call for assistance from an international Oil and Gas Operator who had discovered issues with two of their pipelines in the Norwegian Continental Shelf (NCS).
Operating a 3/4″ branch/12″ header at a pressure of 170 bar and a 3/4″ branch/12″ header at 200 bar, IK Topside designed and fabricated a solution in-house and then installed the two emergency repair clamps.
Contact us today if you want more information regarding our Pipe Intervention service.