This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.
Wall Clamp on Existing Concrete Surface
Project description
The owner of a late-life asset discovered degradation in carbon steel piping at the start of the existing concrete penetration. Based on the solutions and technical knowhow, IK Topside performed a FEED study and was awarded the contract for EPC and installation offshore.
The following steps were taken to perform the work safely and effectively:
- Site survey with 3D scanning of needed volumes
- Extensive testing to select the correct secondary injection sealant
- A 6″ wall clamp system was designed utilising super duplex materials where the secondary sealant volume was sealed off using long-life polymer seals
- The system was installed, allowing the client to re-establish the integrity of the system.