This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.
Oil Riser Change-out – Flexible DBB Isolation & Services
Project description
Riser repairs involve replacing some sections of the risers and possibly replacing some whole riser sections/segments over sea level. This work entails cutting and welding operations.
IK Topside has significant experience in this field, together with specially designed flexible plugs for double block and bleed (DBB) weld isolating and cold cutting of the depressurised risers. A DBB barrier is essential when performing hot work operations on hydrocarbon process pipelines.
Tool specifications for riser change-out operations:
- Double block & bleed function/facility
- All materials are tolerant to hydrocarbon process systems
- Maximum operation pressure: 60°C
- To hold a minimum differential pressure of 1 bar
- Double block seal verification pressure, maximum 3 bar
- Plug annulus can be filled and monitored with water or gas
- Operating temperature: -10°C to +60°C (+90°C intermittent)
- Flexible connection between isolation barriers
- Plug must navigate through miter joints and piggable bends